The second baseline compatibility assessment also includes the analysis of the compatibility between trackside and onboard both within ETCS baseline 3 MR1 and within ETCS baseline 2, in the light of the problem description of the Change Requests included in ETCS baseline 3 R2. ETCS Baseline 3 R2 trackside using only baseline 2 functions) and ETCS baseline 2 vehicles.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |